Gangway systems for mainline trains

Complete systems including a bridge as well as a folding or corrugated bellow.


We develop and produce gangway systems that meet all the special requirements for mainline trains.  The connection systems consist of a bridge and corrugated or folding bellows in single or double form. Integrated lighting is also an option, as are various color possibilities in the bellows. 

The gangway systems fulfill all relevant fire safety standards. Our patented fire-safety solution even provides floor-fire protection of up to 40 minutes.

 
 
 
Railway Brochure
Huebner-Schiene_EN

An overview of our products and system solutions for railway vehicles.

Railway brochure